CHANGE LOG - ARTC DIN Corridor (South Australia - Western Australia)
Changes since 1 July 2009  --  Most recent on top
Change date Drawing Location Details
7 Feb 2012 W092 Rawlinna Siding at triangle apex removed
29 Jan 2012 S106 Nairne Princes Hwy RLX now predictor    
20 Dec 2011 S106 Nairne Jeffrey St RLX now predictor
14 Dec 2011 S074 Bolivar SCT siding development    
14 Dec 2011 S075 Two Wells Sheet rearrangement
21 Nov 2011 S104 Ambleside New loop under construction    
21 Nov 2011 S105 Ambleside New loop under construction
16 Nov 2011 S080 Coonamia Signal changes corrected
16 Nov 2011 S079 Crystal Brook Signal changes corrected    
3 Nov 2011 S080 Coonamia Signals 354 & 355 are now LED
3 Nov 2011 S079 Crystal Brook Signals 336, 337, 344 & 345 now 182, 181, 116 & 117 and are now LED
21 Oct 2011 S079 Crystal Brook Signal 5 now LED, Signal 331 now 265 and LED, LX Weston Rd now Predictor
21 Oct 2011 S401 Gladstone Signals 2 & 4 now LED    
27 Sep 2011 S401 Gladstone/Caltowie Signals GD 1,3 … CT 2,4 now LED
18 Sep 2011 S074 Bolivar Further developments of SCT siding    
18 Sep 2011 S402 Peterborough Romoval of Temp RLX @ Dowds Hill
31 Aug 2011 S061 Bishop Additional Road Traffic Signals @ Hanson Rd RLX    
20 Aug 2011 S111 Bordertown Down end loop connected
18 Aug 2011 S404 Broken Hill Line RLX km adjusted    
18 Aug 2011 S403 Broken Hill Line RLX km adjusted
18 Aug 2011 S402 Jamestown Signal changes & RLX km adjusted    
18 Aug 2011 S410 Caltowie Signal changes & RLX km adjusted
29 Jul 2011 S106 Callington Ballast Siding commissioned    
22 Jul 2011 S111 Bordertown Commissioned Signal 1
21 Jun 2011 S080 Coonamia Signal 3,4, & 4E now LED    
11 Jun 2011 S076 Avon RLX 0751 now active
11 Jun 2011 S075 Mallala Added active RLX 0018    
4 Jun 2011 S075 Two Wells Elizabeth St RLX predictor
4 Jun 2011 S074 Bolivar Commissioned Up end access to SVT siding    
21 May 2011 N405 Kanandah Commissioning of Perilya sdg.
29 Apr 2011 S402 Yongala-Peterborough Signalling changes    
28 Apr 2011 S106 Callington Commissioned new loop
11 Apr 2011 S075 Mallala Hill Rd LX solar    
20 Mar 2011 S111 Bordertown Part Commissioning of new extended loop
1 Mar 2011 S402 Peterborough Signalling changes    
1 Mar 2011 S403 Hillgrange Signalling changes
10 Feb 2011 S107 Monteith New loop commissioned    
10 Feb 2011 S108 Tailem Bend Signal 115 now LED
28 Jan 2011 S074 Virginia Penfield & Gawler Rds RLX now predictor    
27 Jan 2011 S107 Monteith Loop construction progress
27 Jan 2011 S106 Callington Loop construction progress    
25 Jan 2011 S074 Bolivar SCT Siding connected
17 Jan 2011 S110 Coombe Goods Siding o.o.s    
17 Jan 2011 S105 Balhannah Goods Siding o.o.s
17 Jan 2011 S077 Snowtown Goods Siding o.o.s    
17 Jan 2011 S075 Two Wells Goods Siding o.o.s
13 Jan 2011 S110 Keith Further commisioning details    
9 Nov 2010 S110 Keith Extended loop commissioned
30 Oct 2010 S111 Brimbago Changed signal designations    
10 Oct 2010 S110 Tintinara Extenxded Loop commissioned
25 Sep 2010 S107 Monteith New TO #12 Installed    
24 Aug 2010 S403 Hillgrange Extended loop length
3 Aug 2010 S107 Monteith New #7 TO Installed    
3 Aug 2010 S071 Dry Creek Added TA slots
7 Jul 2010 S110 Tintinara Signals 4 & 5 now LED     
4 Jul 2010 W094 Curtin New Engineers siding
4 Jul 2010 S086 Coondambo Final configuration of new loop    
1 Jul 2010 S075 Mallala Boom gates fitted to RLX 0071
1 Jul 2010 S076 Avon New active RLX 0752    
1 Jul 2010 S078 Merriton New active RLX 0069
1 Jul 2010 S086 Coondambo New loop commissioned    
1 Jul 2010 S111 Wirrega New active RLX 1041
1 Jul 2010 S404 Cultana RLX938 now predictor opn & advance warning signs    
17 Jun 2010 S075 Mallala Dublin Rd RLX is Predictor    
17 Ju  2010 S080 Coonamia New Actice LX @ Pirie Blocks Rd    
6 Jun 2010 S085 Hesso RLX 639 is predictor
6 Jun 2010 S107 Monarto South RLX 993is predictor    
6 Jun 2010 S111 Cannawigara RLX 1042 is predictor
6 Jun 2010 S402 Peterborough RLX 894 is predictor    
5 Jun 2010 S076 Long Plains New Active RLX - RLX750
5 Jun 2010 S097 Lincoln Gap New loop proposed    
5 Jun 2010 S107 Swanport Added missing signals 103 + 104
23 May 2010 S104 Ambleside Drawing expanded    
23 May 2010 S105 Balhannah Drawing re-configured (was part 104-105)
23 May 2010 S106 Petwood - Callington Renumbered - was 105    
23 May 2010 S107 Monarto Sth - Murray Bdg Renumbered - was 106
23 May 2010 S108 Tailem Bend Renumbered - was 107    
23 May 2010 S109 Coomandook - Coonalpyn Renumbered - was 108
23 May 2010 S110 Tintinara - Keith Renumbered - was 108-109    
23 May 2010 S111 Wirrrega - Bordertown Renumbered - was 109-110
23 May 2010 S112 Wolseley Renumbered - was 110    
21 Apr 2010 S074 Bolivar Loop extended
21 Apr 2010 S075 Two Wells Additional active RLX's    
21 Apr 2010 S086 Coondambo (new site) New Loop
21 Apr 2010 S089 Thomiar New Loop    
21 Apr 2010 S402 Yongala New active RLX @ 73.460    
14 Apr 2010 S402 Yongala New active RLX @ 91.2    
14 Apr 2010 S105 Petwood New active RLX @ 63.5
12 Apr 2010 S405 Kandandah Removed surplus track    
12 Apr 2010 S402 Yongala Removed surplus track
12 Apr 2010 S108 Coomandook New loop length    
9 Apr 2010 S405 Kanandah Down approach now at 3000m
24 Feb 2010 S062 Gillman Sig 34 now LED    
21 Feb 2010 S093 Goddards Additional details - new loop
17 Feb 2010 S075 Mallala Sig 618 now LED    
3 Feb 2010 S093 Goddards & Chifley New passing loops
3 Feb 2010 S403 Yunta Centre loop X/O removed    
29 Jan 2010 S107 Tailem Bend Added RLX 1001 & 0081
29 Jan 2010 S108 Coomandook Loop extension and RLX1010    
29 Jan 2010 S109 Keith Minor changes
29 Jan 2010 S110 Bordertown Minor changes    
15 Jan 2010 S103 Belair Up end signals now normally black.
16 Dec 2009 S076 Long Plains/Bumbunga Active crossings commissioned @ RLX043 & 778    
16 Dec 2009 S074 Virginia/Two Wells Boom gates added to RLX 722, 723 & 724    
14 Dec 2009 S086 Coondambo Corrected place name    
9 Dec 2009 S075 Mallala Signal 613 now LED
9 Dec 2009 S091 Mundrabilla Typo corrected    
9 Dec 2009 S092 Wilban Typo corrected    
9 Dec 2009 S093 Karonie Typo corrected    
16 Sep 2009 S107 Tailem Bend RLX104 protection and sig 122 changed
18 Jul 2009 S106 Swanport Proposed new loop renamed
18 Jul 2009 S110 Tatiara Proposed new loop added    
18 Jul 2009 S074 Direk Proposed new loop reconfigured 
18 Jul 2009 S402 Jamestown Proposed loop extension added    
15 Jul 2009 S082 Stirling North Signal 14E now LED
10 Jul 2009 S076 Avon Corrected  signal numbers 895 & 987.     
10 Jul 2009 S076 Nantawarra Up departure signals 4 & 4E now LED