CHANGE LOG - ARTC DIN Lease (NSW)
Changes since 1 July 2009  --  Most recent on top
Change date Drawing Location Details
3 Sep 2010 N415 Stockinbinbal - Parkes line Chages to implement Train Order Working
3 Sep 2010 N416 Stockinbinbal - Parkes line Chages to implement Train Order Working
3 Sep 2010 N417 Stockinbinbal - Parkes line Chages to implement Train Order Working
3 Sep 2010 N418 Stockinbinbal - Parkes line Chages to implement Train Order Working
2 Sep 2010 N459 Spring Ridge Tungenbone Rd RLX is Axle Counter
20 Aug 2010 N273 Exeter Removed X overs
16 Aug 2010 N267 Yass Junction Amended Signals
16 Aug 2010 N720 Port Botany New Active RLX
13 Aug 2010 N409 Ivanhoe new Loop
21 Jul 2010 N251 Albury Sig changes
14 Jul 2010 All drawings with an active RLX.  Major review of all active RLX and ID numbers. Changes as required. Listed below - 1 drawing with RLX added
14 Jul 2010 N301 Oakhampton Added missing RLX at Oakhampton Rd
11 Jul 2010 N305 Wards River Terreel Rd LX = ID 601,  Woods RD LX = ID602
11 Jul 2010 N308 Wingham Dollys Flat Rd LX = ID603
11 Jul 2010 N313 Kempey Collombatti Link Rd LX = ID604
11 Jul 2010 N314 Eungai South Bank Rd LX = ID605, Browns Crossing  LX = ID606
11 Jul 2010 N316 Nana Glen Eastbank Rd LX = ID607
11 Jul 2010 N320 Leville Shannonrook Rd LX = ID475
7 Jul 2010 N409 Trida New Active LX
1 Jul 2010 N268 Cullerin New active LX at 256.489
25 Jun 2010 N409 Darnick Active LX at Pooncarie Rd & changed mli's
21 Jun 2010 N410-11 Condobolin AWB Now on 411
18 Jun 2010 N412 Gunningbland New Active RLX @ 496.285
18 Jun 2010 N456 Dobbo New Active RLX @ 465.754
16 Jun 2010 N252 Ettamogah Corrected track layout @ ERH
16 Jun 2010 N252 Gerpgery Corrected several signal numbers
16 Jun 2010 N253 Culcairn Passing Loop 14 commissioned
16 Jun 2010 N502 Waratah Added Up siding
16 Jun 2010 N511 Newdell Junction Added Sigs NJ 24, 165.1, 166.3, 165.2 & 166.6
16 Jun 2010 N512 Drayton Junction Added Sig DJ76
16 Jun 2010 N510 Singleton RE-converted Xover 2B to manual
16 Jun 2010 Q352 Bromleton Introduced dual gauge track
16 Jun 2010 Q452 Greenbank Introduced dual gauge track
15 Jun 2010 N314 Euangi New Actice LX @ 534.282
9 Jun 2010 N319 Banyabba Removed
9 Jun 2010 N320 CamiraCreek Removed
7 Jun 2010 N417 Milvale New loop under construction
7 Jun 2010 N316 Nana Glen New Active RLX @ 638.858
3 Jun 2010 N411 Yarrabandai Yard Re-configured
2 Jun 2010 N308 Taree Moved Signal 21-2
2 Jun 2010 N318 Grafton Added RLX ID Numbers
2 Jun 2010 N319 Koolkhan Added RLX ID Numbers
29 May 2010 N408 Menindee New Active RLX  @ 1006.910
26 May 2010 N417 Quandialla New Loop Under Construction
21 May 2010 N305 South Craven New Active RLX  @ Woods Rd
18 May 2010 N252 Gerogery Olympic Way Overpass added
18 May 2010 N253 Passing Loop 14 Developments added (not yet commissioned)
18 May 2010 N267 Jerrawa New Active RLX  ID 362
18 May 2010 N268 Oolong New Active RLX  ID 360
18 May 2010 N318 Grafton New Active RLX  @ Carrs Peninsula Rd
18 May 2010 N319 Koolkahn New Active RLX  @ Red Lane
18 May 2010 N415 Garema Siding Removed
18 May 2010 N416 Wirrinya New sign
18 May 2010 N417 Bribbaree New Active RLX  ID 112 and MLI
18 May 2010 N418 Stockinbingal New Active RLXs  ID 111 & 266
30 Apr 2010 N411 Derriwong New active RLX @ 528.370 & Signal changes
30 Apr 2010 N417 Bribbaree New active RLX @ 500.272 & Signal changes
30 Apr 2010 N418 Stockinbingal New active RLX @ 452.764
30 Apr 2010 N269 Goulburn Corrected km of Mundy St Bridge
21 Apr 2010 N413 Goobang Junction New drawing link to Parkes CRN
21 Apr 2010 N415 Parkes Triangle New drawing link to Parkes CRN
14 Apr 2010 N314 Nambucca Heads Urunga moved to this sheet and new active RLX @ 576.075
14 Apr 2010 N315 Raleigh Urunga moved to this sheet and new active RLX @ 582.820
14 Apr 2010 N323 Wiangaree RLX ID now 499
10 Apr 2010 N268 Breadalbane LX disyances corrected
10 Apr 2010 N272 Tallong Signal MY6 re-labelled
9 Apr 2010 N313 Kempsey New protected L/X @ 515.875
9 Apr 2010 N314 Eungai New protected L/X @ 538.542
9 Apr 2010 N320 Leeville Removal of Leeville signalling
9 Apr 2010 N321 Casino Changes aspect of Sig 52-3
9 Apr 2010 N411 Yarrabandri Corrected distance
9 Apr 2010 N459 Springridge New protected L/X @ 557.336
6 Mar 2010 N312 Kundabung Dn Distant moved in ppn for loop extension
19 Feb 2010 N459 Connemarra New protected L/X @ 503.480
19 Feb 2010 N308 Killawarra New protected L/X @ 362.886
19 Feb 2010 N305 Wards River New protected L/X @ 285.084
12 Feb 2010 Q353 Greenbank Turnouts converted to dual gauge
12 Feb 2010 Q351 Glenapp Addedd mising engineers siding
21 Jan 2010 N267 Jerrawa Active RLX commissioned at 296.823
21 Jan 2010 N268 Oolong Active RLX commissioned at 249.035 & 288.173
12 Jan 2010 N409 Ivanhoe New signalling protocol
21 Dec 2009 N279 Macarthur New XO & TO for SSFL
18 Dec 2009 N323 Loadstone New road bridge
17 Dec 2009 N459 Connemurra 2A points removed
14 Dec 2009 N271 Carrick RLX numbered 341
11 Dec 2009 N271 Carrick New active RLX @ 204.970
11 Dec 2009 N264 Wallendbeen Minor typo
11 Dec 2009 N270 Goulburn Corrected distances
11 Dec 2009 N269 Joppa Jcn Corrected distances
11 Dec 2009 N268 Yarra New active RLX @ 235.186
11 Dec 2009 N266 Galong Replaced last semaphore signals with 3 aspect colour light
29 Nov 2009 N415 Forbes New RLX protection @ Bathurst St (596.163)
16 Nov 2009 N291 Callawa Iona Park Rd RLX is predictor
10 Nov 2009 N251 Albury South end signal changes
5 Nov 2009 N323 Loadstone Loop extension
4 Nov 2009 N273 Exeter Yarrawa St Ped Xing ID No. Added
4 Nov 2009 N275 Bowral Bowral St Ped Xing ID number added
4 Nov 2009 N291 Callawa Iona Prak Rd RLX ID number
2 Nov 2009 N456 Troy Junction Signs for Coonamble line now TO working
2 Nov 2009 N303 Kilbride Loop extension rearrangements
29 Oct 2009 N310 Kerewong Loop length now 1598m
29 Oct 2009 N302 Mindaribba New loop on down
18 Oct 2009 N303 Kilbride Loop extended to 1500m
18 Oct 2009 N415 Garema Siding available for track machine storage
18 Oct 2009 N719 Botany Yard New Xover 56A/B
12 Oct 2009 N291 Calwalla Added protection @ Iona Park Rd RLX
12 Oct 2009 N306 Gloucester Reinstate Frame E
12 Oct 2009 N409 Darnick Remove Frame B
23 Sep 2009 N253 Culcairn Added new Up PL14 TO
16 Sep 2009 N251 Albury Changed Down end of Platform track arrangement
16 Sep 2009 N253 Culcairn Added new Down PL14 TO
16 Sep 2009 N310 Kerewong Additional loop length
16 Sep 2009 N311 Kerewong Kerewong tunnel to drg310
30 Aug 2009 N265 Demondrille Cowra Line closed
27 Aug 2009 N305 South Craven Repositioned Woods Rd (St)
26 Aug 2009 N251 Albury Removed broad gauge
26 Aug 2009 N273 Moss Vale Added Ped Xing @ 146.893
26 Aug 2009 N275 Bowral Added Ped Xing @ 136.995
12 Aug 2009 N411 Derriwong Loop removed & assigned as Block Point
11 Aug 2009 N320 Camira Creek Labelled as Block Point
5 Aug 2009 N308 Taree RIC siding (Frame B) removed
5 Aug 2009 N302 Mindaribba Loop extended to 1562m. Higher speed signalling commissioned
28 Jul 2009 N406 Broken Hill Revised signal number displays (added 'BH')
28 Jul 2009 N407 Broken Hill Revised signal number displays (added 'BH')